Factory & Office

Mandarin Lighting Technology Co., Ltd.

sales@mandarin-lighting.com+86 150 1735 6363www.mandarin-lighting.com

东莞市沙田镇沙港路1号

No.1, Shagang Road, Shatian Town, Dongguan City 523981, Guangdong Province, China

Start a Project

Capabilities

Bespoke Lighting, From Drawing to Delivery

Every fixture begins as a line on someone else's drawing. Our work is to keep that line intact through engineering, sampling, finishing and delivery — so what arrives on site still reads as the design that was approved.

Detail of a bespoke brass pendant luminaire
01

Bespoke Engineering

Geometry, dimension and finish resolved fixture by fixture, never adapted from a catalogue.

What you bring

You have a designer's fixture schedule and a room with its own constraints; stock sizes will not answer either.

How we answer

We build each fixture around the drawing: canopy position, drop length, tube diameter, glass aperture and the way the light falls on the surface below. Every change is returned as a shop drawing before metal is cut.

Inquire About This Capability
Technical lighting drawings and samples on a workshop desk
02

Drawing Development

Shop drawings, node details and load calculations coordinated directly with the design team.

What you bring

Your ceiling, structure and services are already fixed; the lighting has to land inside them without compromise.

How we answer

We translate the design intent into production drawings, check fixing points against the ceiling build-up, and flag tolerances early — so installation day follows a known sequence instead of a site decision.

Inquire About This Capability
Lighting sample mock-up being assembled in a workshop
03

Samples & Sealing

A lit mock-up in your specified finish, approved and sealed before production begins.

What you bring

Drawings cannot show how champagne gold reads under 2700K, or how a fabric shade holds its shape.

How we answer

We produce a working sample with the specified LED, driver and finish, photograph it lit, and seal the approved version. The sealed sample becomes the reference for every unit in the batch.

Inquire About This Capability
Hotel lighting fixtures inspected on a workshop bench
04

Production & Delivery

Batch consistency, inspection records and packing planned around the installation programme.

What you bring

A hotel opening date does not move because a crate is late or one fixture arrives in the wrong finish.

How we answer

Production is scheduled against your installation sequence, with in-process checks at wiring, finishing and final light-up. Fixtures are labelled by room and level, then packed for the site's access conditions.

Inquire About This Capability

Workflow

Five Stages, One Sequence

01

Requirement & Drawings

Fixture schedule, finishes, ceiling conditions and programme reviewed together.

02

Scheme & Shop Drawings

Proposed construction, fixing detail and load checked against the design intent.

03

Sample & Approval

A lit mock-up in the specified finish, revised until approved and sealed.

04

Batch Production

Metalwork, finishing, wiring and assembly scheduled to the installation sequence.

05

Inspection & Shipping

Light-up checks, labelling by room and packing for site access.

Materials & Finishes

Chosen for How They Hold Light

A finish is not a colour chip. We test it on the produced form, lit, in the room's colour temperature.

Brushed brass sheet surface

Metal

Brass, bronze and steel — spun, welded and finished by hand to a sealed sample.

Hand-blown opal glass lamp shade

Glass

Hand-blown and pressed shades, opal or ribbed, selected for the light they diffuse.

Marble stone surface detail

Stone

Marble and travertine bases, cut and matched so veining stays consistent in a room.

Linen fabric lampshade texture

Fabric

Linen and silk shades with heat-safe linings, stretched to keep a clean silhouette.

Have a Fixture Schedule to Review?

Send the drawings and we will reply with questions, options and a realistic sampling timeline.

Start a Project